I-64/Northampton Boulevard Interchange Project

  • I-64/Northampton Boulevard Interchange Project

As one of the highest volume interchanges in the region, the goals of this project were to increase off-ramp capacity and eliminate difficult arterial weaving movements on Northampton Boulevard. The project was completed six weeks ahead of schedule.

The acceleration lane from Northampton Boulevard to I-64-west was lengthened and the I-64 east ramp to Northampton Boulevard was realigned to a signalized “T,” to provide access to Northampton Boulevard in both directions.

The work included widening the I-64 west exit ramp to Northampton Boulevard from two lanes to five lanes (two left turns, two right turns and the existing continuous flow lane that was maintained for a more integrated movement onto Northampton Boulevard). The traffic signal at Northampton was also modified.

Quinn provided a lead field inspector and two construction inspectors for this project, that also included the installation of a box culvert with Cast-in-Place (CIP) extensions, construction of a new embankment with Lightweight Foamed Concrete Fill (LFCF), and placement of asphalt concrete pavement.

 

 

Overview

As one of the highest volume interchanges in the region, the goals of this project were to increase off-ramp capacity and eliminate difficult arterial weaving movements on Northampton Boulevard. The project was completed six weeks ahead of schedule.

Client

VDOT/Branch Civil

Services

Construction Inspection

Includes: